MSU Denver Housing & Retail Building
ABOUT THE PROJECT
MSU Denver is constructing a 12-story student housing building. The building will include a floor dedicated to the Classroom to Career Hub (C2 Hub), which, in collaboration with Community College of Denver, connects students with career opportunities and industry partners. The ground floor will house multiple food and beverage options for students, faculty, staff, and community members.
The building will also provide additional opportunities for MSU Denver students to live on campus addressing growing concerns about soaring housing costs in Denver. Student housing aligns with MSU Denver’s mission to make higher education more accessible, addressing the critical need for affordable on-campus living. With rising living costs and limited housing in Denver, this initiative removes barriers, fosters belonging and enhances student engagement and retention.
Project Impacts & Updates
RTD 11th and Auraria Bus Stop Closure – Alternative Options
The construction team is working on a plan to limit impacts to the campus community. There will be noise, it is unavoidable, but they are working to time the loudest work during appropriate times.
Starting July 21, 2025, and continuing until project completion: In late July, the campus community will begin to see fencing installed, contractor trailers positioned, and the site secured.
The 11th Street meters between Auraria Parkway and Walnut Street will be permanently closed, as will one metered space on the southeast corner of Walnut and 11th.
Additionally, the sidewalk on 11th Street between Auraria Parkway and Walnut Street will be closed.
Project Overview
| Anticipated construction start | June 2025 |
| Anticipated construction end | March 2027 |
| Budget | $115 million |
| Funding source | Student housing revenue as well as state allocations and philanthropic contributions |
| Architect/ Engineer | SAR |
| Contractor | PCL |
Traffic Alert: 11th Street Lane Closures (Nov. 18 – Dec. 6)
Date: November 18 – December 6, 2025
Time: Daily, 6:00 a.m. – 6:00 p.m.
Location: South and north left-turn lanes on 11th Street between Auraria Parkway and Walnut Street
As part of ongoing utility work on campus, crews will be completing a utility tie-in near the intersection of Auraria Parkway and 11th Street. This work requires access to the sewer connection point located in the middle of the roadway.
What to Expect:
- Temporary closure of the south and north left-turn lanes on 11th Street.
- Lane closure safety measures will be in place, including barriers, signage, and flaggers to assist with equipment entry and exit.
- All lanes will be road-plated and reopened by 6:00 p.m. each day.
- Associated noise is expected during roadway demolition. Noise will not occur during the utility installation portion of the work.
Please allow extra time when traveling through the area and follow all posted signs and flagger instructions to ensure safety.